I was finally able to make good progress today. I changed out the light switches that needed to be updated, got the new light box in the ceiling of Alyssa’s room, patched the old light box, and put putty where necessary to smooth things over. (I even wired a temporary drop light to operate by the switch until we but a light for that room.) I also got the tile in place around the kids’ toilet by tomorrow night I should be able to add the grout and then seal it all this weekend. Hopefully we’ll have settled on a paint color for the room by then.
Leave a Reply